Breathable Insulation

“Breathable” is a useful starting question, but it is not a complete insulation specification. Ask how the whole wall handles water vapour, liquid water and drying.

Vapour permeability is only one part of moisture behaviour

Water vapour can move through materials by diffusion. Liquid water from rain, leaks and other sources behaves differently. Moisture storage, capillary movement, air leakage, ventilation and drying conditions also affect a construction.

A vapour-permeable finish does not automatically make an underlying wall moisture-safe. It does not replace ventilation, repair a leak or guarantee prevention of condensation or mould.

Check every layer of the wall

Assess the existing wall, paints, renders, adhesives, insulation and proposed finish together. An incompatible layer can change drying even when another layer is described as breathable. Include external exposure and internal moisture conditions in the assessment.

For traditional masonry, consult someone experienced in the building type. Read the solid-wall guide and compare internal and external insulation approaches before selecting components.

Ask for product-specific cork evidence

Sprayed cork, trowel-applied cork, lime-and-cork mortar and cork boards are different products. Do not transfer a vapour-resistance or thermal result from one product to another. Request the exact product, installed thickness, test method and limitations.

Use the ECOPROCORK technical document library and system guide. Product data supports design decisions; it does not establish whole-wall moisture performance or certify every combination of components.

Deal with condensation and damp at the source

If the wall is cold or mould returns, assess moisture sources, heating, ventilation, thermal bridges and building defects. The appropriate work may include repairs or ventilation changes alongside a suitable insulation design.

Start with the cold-wall assessment guide. A thin coating should not be described as a universal damp treatment or as equivalent to thicker insulation.

What to request from your designer or installer

  • The existing and proposed wall build-ups, including finishes.
  • Evidence for conductivity and moisture properties at the specified thickness.
  • An assessment of rain exposure, drying and condensation risk appropriate to the construction.
  • Details at openings, floor and roof junctions and service penetrations.
  • Preparation, inspection records, maintenance and written responsibilities.

Request professional specification support or send your project details to discuss relevant cork components.

Plan the next step

General planning guidance reviewed 16 October 2026. See Energy Saving Trust: solid-wall insulation and Historic England: energy efficiency and retrofit. These independent sources explain general principles; they do not approve an ECOPROCORK system.