Spray cork fire classification: AITEX report for CORCHO PROYECTADO DECOPROYEC, sample 2024AN1825-S01. The supplied laboratory certificate records C-s1,d0 under EN 13501-1:2018. Therefore, use this result only within the documented specimen and mounting scope.

Download the original English certificate and complete bilingual report (PDF)

Download all original laboratory certificates and complete report (PDF)

AITEX English reaction-to-fire certificate 24AN1825 showing C-s1,d0, issued 31 July 2024
Original AITEX English certificate. Download the complete report to read its scope and limitations.

English explanation of the spray cork fire classification

ItemRecorded information
LaboratoryAITEX
ApplicantDECOPROYEC SUBERTRES, SLU
Report reference2024AN1825; certificate reference 24AN1825
Sample2024AN1825-S01 · CORCHO PROYECTADO DECOPROYEC
Test date22 July 2024
Issue date31 July 2024
ClassificationC-s1,d0
Classification standardEN 13501-1:2018
Test methods citedEN ISO 11925-2:2020 and EN 13823:2020
Coating thickness in supplied product description3 mm
Composition recordedAcrylic resins and granulated natural cork
SubstrateStandardised fibre-cement; density 1800 ±200 kg/m³; thickness 8 ±2 mm; Euroclass A2-s1,d0

The laboratory already supplies English wording in the certificate and bilingual report. For convenience, this page explains where to find the main information. However, use the complete laboratory document when checking a specification.

Recorded results

First, the laboratory reports six small-flame tests and three Single Burning Item tests. Its table records “No” for flame spread to 150 mm and filter-paper ignition. It also records “No” for lateral flame spread and flaming droplets within 600 seconds. The SBI figures include FIGRA₀.₂ MJ 131.39 W/s and FIGRA₀.₄ MJ 93.47 W/s. In addition, the report lists THR₆₀₀s 3.27, SMOGRA 0.00 m²/s² and TSP₆₀₀s 35.56 m². For the full units and criteria, read the original results table.

Check the report against your specification

First, identify the exact coating and batch you intend to use. Then compare the thickness, substrate and mounting arrangement with the report. For example, a different insulation board changes the assembly that needs assessment. Therefore, do not transfer this classification to a complete ETICS system without supporting evidence.

Also check the applicable regulations and project requirements with your designer or competent adviser. If the proposed build-up differs, request suitable evidence before installation. Finally, keep the agreed specification and supporting documents with the project records.

Scope and limitations